I-94 & Fred W. Moore Highway Improvements
Casco & Columbus Townships, St. Clair County, Michigan
The project consisted of the reconstruction of the interchange of I-94 and Fred W. Moore Highway. TEC performed eleven test borings at the site using an all-terrain vehicle (ATV) mounted auger equipment to depths of 10 to 20 feet below the existing surface.
Approximate GPS coordinates and offsets at the boring locations were determined by a hand held GPS device.